BASlink 360 GmbH: Our Response to Market and Technological Developments
Quick Answer
The founding of BASlink 360 GmbH on March 11, 2026 is the logical
response to the increasing complexity of building automation and the
“EPBD jungle”. It is an independent spin-off from digiasset GmbH.
It addresses three central developments: the positive development and
market perception of Bluetooth NLC as a standard,
the strict requirements of EPBD 2024, and the massive
market demand for interoperability and professional integration.
As a strategic integrator, BASlink 360 closes the gap between
technology manufacturers, system integrators, and building owners.
Key Takeaways
- Strategic focus: Integration of isolated trades into a communicating building automation system (BAS).
- Technological core: Use of mature Bluetooth NLC as a "gateway" for flexible intelligent applications that are expandable.
- Location Munich: Deliberate choice of a strong infrastructure for international positioning.
- Regulatory pressure: EPBD 2024 makes intelligent monitoring, as well as reporting (Smart Readiness Indicator SRI) and BACS mandatory.
The Vision: Why Now? The “Bet” on Wireless – Why Bluetooth NLC Scales Renovation
The founding of BASlink 360 was a deliberate step to make the implementation of EPBD 2024 more efficient and economical. In numerous consulting and lighting projects, three market drivers emerged that now form the foundation of the company:
- The installation cost trap: Our project experience shows that retrofitting cabling is often more expensive than the system itself. Wireless solutions reduce this cost factor.
- Standardization: Technologies like Bluetooth NLC serve as a universal base for new applications and offer true interoperability. It can be easily configured on-site via smartphone and is already used by leading manufacturers.
- Lighting as IoT backbone: We follow McKinsey’s assessment that lighting infrastructure forms the ideal framework for the Internet of Things (IoT) in buildings.
- Regulation: The EPBD directive will require intelligent building control systems in the future.
- Integration demand: There is a lack of expertise in the market to efficiently connect different manufacturers and systems.
The Ecosystem of Integration
To reduce costs and implementation risks, BASlink 360 connects three key stakeholders:
Technology Manufacturers
Support in developing market-ready, open solutions.
System Integrators
Partners for technical implementation on site.
Building Owners
Protection of assets against depreciation through timely compliance.
Compliance Deadlines: No Time to Wait
The timing of our company’s founding is also a response to urgency. The deadlines of EPBD 2024 are strict and provide no exceptions, even for recently renovated buildings (grandfathering).
| Date | Requirement |
|---|---|
| December 31, 2024 | BACS requirement for non-residential buildings with heating/cooling capacity > 290 kW |
| May 29, 2026 | Deadline for implementing EPBD into national law |
| July 01, 2027 | Mandatory Smart Readiness Indicator (SRI) for systems > 290 kW |
| December 31, 2027 | Mandatory automatic lighting control with presence detection. |
| December 31, 2029 | Expansion of BACS obligation to all buildings > 70 kW. |
Learnings from the Founding Phase
One key learning concerns brand identity. Originally planned as “BAS-Link” to symbolize Building Automation Systems (BAS) and their connectivity (Link), the name was expanded to BASlink 360 due to legal considerations. Another central result of our market validation: decisions must be based on rational feedback from potential customers in order to distinguish purely emotional interest from real market demand. Despite a highly competitive environment, the focus is now clearly on continuous business model development and patient but consistent execution.

Frequently Asked Questions
“BAS” stands for Building Automation Systems and forms the technological foundation of building automation.
“Link” symbolizes the intelligent connection to the next level, such as BACS (Building Automation and Control Systems) or BMS (Building Management Systems), integrating isolated technology manufacturers into a communicating ecosystem.
“360” represents the holistic and comprehensive implementation, taking into account both the regulatory requirements of EPBD 2024 and market needs for cost efficiency and measurable ROI.
The official notarization took place on March 11, 2026, in parallel with the Light + Building trade fair in Frankfurt. Registration and official launch were completed by the Munich District Court commercial register on April 1, 2026.
In addition to fines, there is a risk of property devaluation ("stranded assets") and loss of rental viability.
“BASlink 360 emerged from the many years of experience of digiasset GmbH, which operates as a consultant and service provider in the lighting industry and identified key market drivers early on. As an innovation hub, digiasset recognized the ideal time-to-market and developed an independent company to specifically address the requirements of building automation.”
Make Your Buildings EPBD-Ready with BASlink
Discover our open-standards BACS solutions, universal gateways, and IEQ monitoring platforms — designed for non-residential compliance.
Contact Us